AWOL Contractors

The tile guys are finished, but only the electrician has returned our calls this week. (The electrician happens to be my son.)  We still have the following list of unfinished tasks:

  • Hang medicine cabinets, laundry room cabinet and bathroom cabinet .
  • Finish baseboards.
  • Finish repairs and trim on stairs.
  • Install kitchen countertops.
  • Install kitchen sink and faucet.
  • Hang last two doors.
  • Trim two doors so they will close over the thresholds
  • Install shelving that was missing in the initial cabinet shipment
  • Install toilet in hall bathroom
  • Install drapery rods.
  • Install tub/shower faucet.
  • Install dishwasher.
  • Replace electrical panel (the painters sprayed paint on all the wires – apparently, that can present a fire hazard.)
  • Replace the CAT 5 cable the flooring guy demolished.
  • Install the missing diffuser in the master bathroom light, when the manufacturer sends it.
  • Repair and repaint walls that were damaged by subsequent projects.
  • Repair the leaking chimney…correctly this time.
  • Install shelving and rods in spare bedroom closet and coat closet.
  • Sears “can’t find” the washing machine we purchased, but agreed to ship an upgrade.  It is supposed to be delivered tomorrow.

Cleaning and unpacking continues….